Wednesday, February 3, 2010

Visual Basic format

AREVA T&D (Guangdong) Switchgear Co. Ltd.

Machine Manufacturing/Heavy Industry | |
2008-2 - Now Planner
Conghua, Guangzhou | Full-time | | | employees |
Planner
Mid Career(2+ years experience)
Currently and solely working as the planner in production, procurement and also contract delivery for over 200 projects.
Directly report to the General Manager.
Cooperate each department in the daily business and help them to build up the operation process to fit in the situation changes.
In charge of the ERP system and manage about 500 pieces of components inventory daily.
Produce planning tools for monthly, weekly planning and material requirement plan in Excel.
Utilise planning tools for building up planning for each department in the daily business.
Full cooperate with all departments both systematically and physically transferring from fully imported material production to localized material production.
In charge of warehouse management with 4 subordinates to operate and monitor all the production material movement within the operation.
Redesign raw material management in order to increase the efficiency of material pick-up process.
Define the better production lot size for production output optimisation in peak season.
At the moment, the company on time delivery is 95% and inventory day is around 15 days.

Peter Hunt’s Bakery Food Ltd. (Bolton, UK)

Consumer Products(FMCG) | |
2007-5 - 2007-10 External Consultant (Internship)
Bolton, United Kingdom | Full-time | | | employees |
Consultant for International Affaire
Student
Responsible to the Managing Director of the company for a waste reduction project.
Identified about £ 200,000 waste (67% of their annual profit) in 5 months production.
Conducted three recommendations to achieve waste reduction objective:
Balancing capacity in the packing line, possible annual gain £ 10,500 for 3 products;
Enhancing the quality check process to ensure product outputs meet client specifications;
Standardising the setups by avoiding un-needed human intervention to save time up to 50%.
Redesigned the company’s waste notice board from Visual Basic format to Excel format for easy maintenance and implementation reasons.
Support and create a business culture about all-staff involvement and continuous improvement.
Raised future projects (e.g. stock management, etc.) to further improve the company’s situation.
The project was rewarded distinction.

No comments:

Post a Comment